Kitchen Remodeling II

Well the cabinets arrived today! Tomorrow the installer will give them a look over for damage, if they are correct etc. They were a day early in getting here so that gives us plenty of time to tear out the old cabinets and prep. The electrician is coming Monday to move a few outlets around, add some new switches and such for the under cabinet lighting etc. A plumber is coming Wednesday to install a gas line for the new stove.

After they were unloaded, the installer came over the next day to check them out for damage. Everything is good to go, just one little minor thing to be replaced (a drawer front that screws on) that won’t hinder installation.

 

And so begins the tear out. These are old built-in cabinets, and the fellow who built them left a note scribed to one of the boards in the upper cabinet for posterity. It reads “Cabinets built by Sam Hollander, Sept 11 1962. Wages $4.00 per hour, My age is 35″…

These are “Before” shots”

 

 

The counter tops are glued down and nailed so my son and I are using a car jack from my Jeep to slowly “pry” up the tops. Normally you would just use a sledge hammer and not care, but I am practicing on these to eventually remove the bathroom counter top with out damaging the cabinets because in the bathroom we are keeping the 8ft. cabinet and just replacing the counter top.

 

 

First getting out the base cabinets seemed to be the right thing to do, and not having to bend over to get the top cabinets out. The base cabinet came out in one piece, the upper cabinets had to be dismantled to remove them. After all has been removed, I did some sanding and spackling. So much for day one.

 

 